Procurement of Various Cathodic Protection Materials for Robertkiri Platform CP Upgrade
SHELL PETROLEUM DEV. COMPANY
2006
To conduct a soil resistivity measurement within the surrounding of the SPDC Ovhor Concrete Barge flowstation using the winner four terminal method. Measurements was made at each location to determine average soil resistivity to depths of 10fts interval
NAOC/HERMANN & CROSS LTD (SUB-CONTRACTOR)
2008
Coating Defects survey and repairs of Swamp and Land area pipelines of Nigeria Agip Oil Company (NAOC)
SHELL NIGERIA GAS LIMITED
2010
Coating condition survey on all Shell Nigeria Gas Transmission Lines and Distribution lines and repairs of selected defect points
NEWTECH/SHELL PETROLEUM DEVELOPMENT COMPANY
2006
Coating condition survey on selected delivery and trunk lines of SPDC, verification dig up and repairs of three selected defect points in each of the pipelines
SHELL PETROLEUM DEV. COMPANY
2007
Coating condition survey of the 48” Forcados Terminal Trunkline to sea shore, verification dig up and repairs of three selected defect points.
SHELL PETROLEUM DEV. COMPANY
2006
Coating condition survey on selected delivery and trunk lines of SPDC and repairs of selected defect points in each of the pipelines
SHELL PETROLEUM DEV. COMPANY
2004
Sapele and Oben NGC Micro-Wave Tower Rehabilitation.
CHEVRON NIGERIA LIMITED
2006
Coating condition survey, Close Interval Potential Survey (CIPS) and General corrosion survey of the Eastern Swamp Pipelines
SHELL PETROLEUM DEV. COMPANY
2004
Welding and laying of 4” x 12km length of Gas line from well 8 to Eriemu flowstation
SHELL PETROLEUM DEV. COMPANY
2003
Manual surface preparation and maintenance painting of Afiesere flowstations
SHELL PETROLEUM DEV. COMPANY
2004
Afiesere and Utorogu NGC Micro-Wave Tower Rehabilitation
SHELL PETROLEUM DEV. COMPANY
2002
Manual surface preparation and maintenance painting of Utorogu, Eriamu and Afiesere NGC Gas Stations